Simsbury Pump Station

This was the final phase of a two-part project for this pump station. The electrical upgrade was completed last year. We designed this system around an 80kw generator that is fueled by propane. A new 1000 gallon above ground tank will provide the fuel for this power system. With all of these systems being new the operators of this pump station will enjoy the highest reliability of their back up power system.

Where:

Simsbury, Connecticut

What:

A Cummins C80N6 generator with a previously installed Asco 200-amp NEMA 3R transfer switch and a 1000-gallon propane tank

Purpose:

To complete the pump station upgrade by adding a new generator so that they can provide their customers with water during future power outages