New Haven

An image on the left of a commercial generator being transported on a truck and an image on the right of the same commercial generator being airlifted into place

The Challenge

Medical facilities that provide a full range of patient services stand to lose a lot in the event of a power outage. The loss of temperature-controlled medications can be costly. They also must interrupt scheduled procedures that can’t be completed without power and they are forced to cancel and reschedule all the affected appointments. A back up power system is a must as there is just too much at stake here. The goal is this project was to allow this community based medical facility to offer uninterrupted service and to protect the temperature sensitive medications during power outages.

 

The Solution

Tower Generator designed this system around a 125 kW generator that is fueled by natural gas. The gas meter was upgraded to a two-pound system in order to meet the generator fuel requirements. This project required Tower Generator to cut the asphalt in the parking lot as the generator is located on an island. Tower Generator also installed bollards in front of the generator for added protection between the parking area and the generator. This whole facility is on the new backup generator so it will be business as usual when the standby power starts within seconds of the next outage.

The Details

Customer Details

Segment:
Commercial

Facility Type:
Medical Facility

State:
Connecticut

City/Area:
New Haven


Generator Details

Generator Brand:
Cummins 

Model:
C125N6

Kilowatt Size:
125 kW

Type:
Standby

Fuel:
Natural Gas

Transfer Switch Brand & Size:
ASCO 300 Series-800 Amp