Healthcare Facility

An image of a concrete base with electrical wires, an image of a commercial generator being airlifted into place, and an image of a fully installed commercial generator from left to right, respectively.

The Challenge

In the medical world, a power outage can have devastating effects. Critical patient services can be interrupted, vaccines or medicines can be ruined as the refrigeration fails, and ultimately the whole facility can shut down. Quite frankly medicine can’t be practiced without power. This urgent care facility needed to remain operational in the event of a power outage. The critical nature of their services requires power.

 

 

The Solution

Tower Generator designed the system around a natural gas-fueled 60 kW generator. Space was tight at this site but we were able to solve the issue for the client. This facility is now up and running even when the power fails and that is a win for everyone concerned.

The Details

Customer Details

Segment:
Commercial

Facility Type:
Medical Facility

State:
Connecticut

City/Area:
New Britain


Generator Details

Generator Brand:
Cummins 

Model:
C60

Kilowatt Size:
60 kW

Type:
Standby

Fuel:
Natural Gas 

Transfer Switch Brand & Size:
ASCO (200 Amp Three Phase)

Let’s Talk!

Reach out to Tower Generator to discuss your generator needs.