The Challenge
This new branch was in need of a reliable standby power system that would assure business as usual in the event of an outage. The bank was looking to provide service to its customers without interruption.
The Solution
Tower Generator designed this system to utilize the natural gas fuel source that was already present at this site. Besides the 25 kW generator and transfer switch, Tower Generator also installed the pad and the bollards.